POWER CONSTRUCTION CONTRACTOR

CONSTRUCTION OF AIR ELECTRIC LINES UP TO 500KV

On February 22, 1988, Electrical Construction Company 3 was established under Decision No. 174 NL/TCCB of the Minister of Energy Department (now the Ministry of Industrial Department ) on the basis of merging two companies, namely Wire Construction Company and Station 3 and Wire Construction Company and Station 5.

In 1991, our company was honorably awarded the Second-class Labor Medal by the party and government for outstanding achievements in upgrading and building the Thanh Hoa - Quang Nam - Da Nang power transmission line (1987-1990).

BUILDING SUPPLY STATION UP TO 500KV

Building the main substations is the field that is invested in parallel with construction of transmission lines, is the basic business associated with the birth of the Corporation.

VNECO's substation construction and installation capacity has been verified through the satisfactions and trusts of the investors - with the motto "Quality assurance, response schedule, absolute safety" with over 60 products. substation from 500kV (capacity from 300 MVA to 450 MVA); 220kV (capacity from 63 MVA to 125 MVA) to 110kV (capacity from 5 MVA to 50 MVA)

CONSTRUCTION OF UNDERGROUND CABLES

Along with the construction of transmission lines and substations, VNECO is always interested in investing in the development and construction of power cables and underground cables, superheated cables.

  • Participated in the construction and installation for thousands kilometers of cable systems in the substations that the unit has constructed.
  • Currently, we are strategically cooperating with Ankura Group in participating in the bidding packages for Vietnam underground power grid.

GENERAL CONTRACTOR OF WIND POWER FACTORY CONSTRUCTION

VNECO is the General Contractor to build wind power plants with the goal of providing clean energy, prioritizing the use of renewable energy.