HI-TECH EQUIPMENTS

800 TON WIND POWER INSTALLATION CRANE – ZOOMLION ZCC9800

The Zoomlion ZCC9800 is a specialized crawler crane.
Expert in wind power installation. The Zoomlion ZCC9800 crane is installed with an intelligent management system that can monitor the working condition of the crane remotely, diagnose function failure, warn of abnormal operation, can be easily maintained, etc.

TECHNOLOGY OF NO TOUCH GROUND LINE DRAGGING

On February 22, 1988, Electrical Construction Company 3 was established under Decision No. 174 NL/TCCB of the Minister of Energy Department (now the Ministry of Industrial Department ) on the basis of merging two companies, namely Wire Construction Company and Station 3 and Wire Construction Company and Station 5.

In 1991, our company was honorably awarded the Second-class Labor Medal by the party and government for outstanding achievements in upgrading and building the Thanh Hoa - Quang Nam - Da Nang power transmission line (1987-1990).

USE OF A STRING MACHINE TO IMPROVE THE WIRE EFFICIENCY

Building the main substations is the field that is invested in parallel with construction of transmission lines, is the basic business associated with the birth of the Corporation.

VNECO's substation construction and installation capacity has been verified through the satisfactions and trusts of the investors - with the motto "Quality assurance, response schedule, absolute safety" with over 60 products. substation from 500kV (capacity from 300 MVA to 450 MVA); 220kV (capacity from 63 MVA to 125 MVA) to 110kV (capacity from 5 MVA to 50 MVA)